bridge

Main arches of Lancangjiang Railway Bridge connected successfully


The main arches of the Lancangjiang Railway Bridge were successfully connected as 130 engineers worked collectively on the project. 141 days of construction period was required.

Please follow and like us:
O

Leave a Reply

Your email address will not be published. Required fields are marked *